Diagnosis You want to enter a meter reading for activity day &V1&. This would result in &V2& meter readings for one day. At least one ofthese has the meter reading reason category move-in or installation(meter reading result &V4&). Note for error analysis: Meter reading document number &V3& already exists for this. Procedure
- Simplify this collection of meter readings by deleting unnecessary meter
readings.
- No more than five meter readings should exist for this day.
- Only meter readings that trigger billing> or technical>
meter readings are important. For example, periodic meter readings>, or changes to the installation structure>. Move-in> isalso important.
|