Diagnosis You want to enter a meter reading on activity day &V1&. However, there are at least &V2& unnecessary meter readings for this day, which disrupt the conflict resolution. The conflict is caused by atechnical meter reading reason (meter reading reason &V4&). Note for error analysis: Meter reading document number &V3& already exists for this. Procedure
- Simplify this scenario of meter readings by deleting unnecessary meter
readings.
- No unneccessary meter readings should exist for this day.
- Only technical> meter readings and meter readings that trigger
billing> are important. For example, periodic meter readings> orchanges to the installation structure>. Move-in> is alsoimportant.
|