SAP Message TU406 - Optional contracts incorrectly grouped together in event R964

Diagnosis
In event R964 (creating a pseudo-mandatory group using several optionalcontracts),you selected different optional contracts for which you want to createa joint budget billing plan.
However, contracts &V1& and &V2& have different portions (&V3&/&V4&).This means that a joint budget billing plan cannot be created for thesecontracts.
INCLUDE ISU_VERARB OBJECT DOKU ID TX

Procedure
Either change the schedule master data for both contracts so that theycontain the same portion, or change event R964 so that you can createseparate budget billing plans for them.