SAP Message TU184 - Interval btw. sched. MR date and end MR period must be less than &1 days

Diagnosis
This interval specifies the scheduled reading date in the schedulerecords. To ensure that the allocation of portion schedule records tometer reading schedule records is suitable, you must not make thisinterval too long. With a period length of &V2& days this interval mustnot be longer than &V1&.