SAP Message TU138 - Interval btw. sched. MR date and end MR period must be less than &1 days

Diagnosis
This interval defines the scheduled reading date in the schedulerecords. To ensure appropriate allocation of the meter reading schedulerecords to the schedule records of the portion, this interval must notbe too long. If the period length is 12 months, the interval must notbe greater that &V1&.

Procedure
Change the entry for the interval to a value smaller than &V1&.