SAP Message TU080 - End of MR period (&2) of &1 is only &3 day(s) before end of bill. per. &4

Diagnosis
The end of the meter reading period of the meter reading unit is only afew days before the end of the billing period for the correspondingportion.

Procedure
If the interval between meter reading and billing is too short,organizational problems may arise in the utility company. The intervalmust be at least one day if the dataset is to be consistent.