SAP Message TU007 - Scheduled MR date &2 of &1 is only &3 days before end of billing period

Diagnosis
The interval between the scheduled meter reading date and the scheduledbilling is only &V3& days long.

Procedure

  • If this was intentional, ignore this warning.

  • If the period should be longer, change the scheduled meter reading date
  • in the meter reading unit.