SAP Message S2L105 - Error calculating the planning horizon

Diagnosis
An error occurred when calculating the absoluteplanning horizon. (See following message inlog.)

System Response
As the system cannot determine the planning horizon, it uses aconsumption-based logic for this
supply segment.

Procedure
Check the control cycle and the scheduling profile.