Diagnosis Automatic production supply is not intended for control cycle &v1&(material &v2&, plant &v3&, supply area &v4&). System Response The system only displays the stock situation at the control cycle. Procedure Automatic production supply using summarized JIT calls is onlysupported by certain special control cycles. KANBAN control cycles cannot be used for example. To change the supply strategy over to automatic production supply, youmust replace existing control cycles with new ones if necessary. When changing over, note that the material stock must be suppliedexclusively by one control cycle, as otherwise the lot size calculationwill not work correctly. In warehouses that are simply structured and do not have theWarehouse Management system > bin stock, this means there can only be one control cycle perstorage location and the total storage location stock must be availablefor this control cycle. In WM managed warehouses with bin stock, this means that only onecontrol cycle can exist for a material per WM storage bin and the totalbin stock must be available for this control cycle. |