Diagnosis No maximum production rate (line hierarchy) exists for line &. System Response The system still compiles the sequence schedule, using the planned/operative production rates. Procedure You are strongly advised to maintain a maximum rate in the linehierarchy, since otherwise, the scheduling based on takts uses avariable assembly line speed, which can lead to inconsistentscheduling, depending on the planned/operative rates you have set perperiod. |