SAP Message RY406 - Yield curve & has a change in currency in the interpolation

Diagnosis
A currency changeover is defined on a key date for yield curve typeV1. you attempted, however, to determine a yield curve from the twoadjacent yield curves. The key date of the currency changeover isexactly between these two curves.

System Response
Determination of the target yield curve is not possible.