System Response With breakpoint-, partially completed and final confirmations theactual time is calculated for the confirmation interval therebycompleted. Here an error has occurred. Procedure You should check whether one of the following points could havetriggered the error:
- No shift sequence was assigned to the work center.
- No available capacity was defined for capacity entered in the work
center for scheduling.
- The factory calendar has not been maintained for the current calendar
year.
- The reporting time lies before 01.01.1970.
- The work center entered does not exist.
|