Diagnosis You cannot move the valid-to date forward. The following reasons arepossible:
- The material assignment is required
- The validity period of the assignment to change must lie within the
validity period of the parent node assignmentProcedure Change the valid-to date such that it is not earlier than the valid-todate of the child node assignment.
|