SAP Message RTCMMD132 - First adjust the "Valid To" date of all child assignments

Diagnosis
The validity period of the assignment to change must lie within thevalidity period of the parent node assignment.

Procedure
Change the valid-to date to a date earlier than the valid-to date of theparent node assignment.