SAP Message RTCMMD126 - First adjust the "Valid From" date of all child nodes

Diagnosis
The validity period of the assignment to change must lie within thevalidity period of the parent node assignment.

Procedure
Change the valid-from date to a date later than the valid-from date ofthe parent node assignment.