SAP Message RTCMMD119 - Extending the "Valid From" date is not allowed

Diagnosis
The validity period of the assignment to change must lie within thevalidity period of the child node assignment.

Procedure
Change the valid-from date to a date earlier than the valid-from date ofthe child node assignment.