|
Diagnosis An end-date for the job is specified when the job is scheduled (nolonger "start after date/time"). When the job is started for the first time, this end-date is applied toALL subsequent periodical jobs. This is different to the standard SAP batch schedulings. The end-date is checked each time the job is restarted, and if theend-date has passed, the job is removed from the schedule. This is what has happened in this case. Procedure Reschedule the job if you want to keep it running. |