|
Diagnosis During the master data update, the master data tables are read todetermine which records of the data package that was passed have to beinserted, updated, or modified. Some records are inserted into themaster data table by a concurrently running request between reading thetables at the start of package processing and the actual recordinsertion at the end of package processing. The records inserted by the concurrently running process are overwrittenby the master data update. Procedure
- Check if the values of the master data record with the key specified in
this message are updated correctly.
- Run the RSRV master data test "Time Overlaps of Load Requests" and enter
the current request to analyze which requests are running concurrentlyand may have affected the master data update process.
- Re-schedule the master data load process to avoid such situations in
future.
- Read SAP note 668466 to get more information about master data update
scheduling.
|