SAP Message RSAR164 - Information missing for currency translation into internal format

Diagnosis
You have set the Currency conversion for external systems<>indicator on the External data parameters tabstrip in theScheduler. However, no information on the currency of the amount fieldV1 could be determined.

System Response
The loading process has been terminated.

Procedure
There are four ways to solve this problem:

  • If the corresponding amounts are already loaded in internal SAP format,
  • remove the indicator from the Scheduler.
    • Choose an InfoObject with a fixed currency for loading the amount.

    • Define a fixed value in the transfer rules for the currency field in
    • the communication structure.
      • Insert a currency field into the transfer structure.

723852RSAR 164: Information missing for currency translation