|
Diagnosis You have not specified a planning resource for trial &V1&. This value ismandatory for trial planning. System Response The system does not create a planned order, since the trial is notconsidered in trial planning unless it has a planning resource. Procedure If you use trial planning, assign a planning resource to the trial. If you do not use trial planning, change the configuration of thePlanning Resource> field in Customizing. |