|
Diagnosis In a recipe, there may only be one valid change status on each date ata time. The valid-from date of a new change status must therefore bedifferent to that of existing change statuses. There is, however, a change status for the recipe you selected whosevalid-from date is identical to the key date> youentered or the date of the change number> youentered. The system does not create the new change status.Procedure RESET N1 Check the valid-from date of the existing change statuses. Use a key date or change number with a date that is not yet used in therecipe for your new change status. |