|
Diagnosis The first change status> ofthe recipe you selected has &V1& as the valid-from date. For thisreason, the following functions can only be executed as of this date:
- Loading the recipe
- Adding a new change status for the recipe
However, you have entered a key date> orchange number> whose date is before &V1&. Thesystem does not execute the function.Procedure If you want to load the recipe: Use a key date or change number whose date is after &V1&. If you want to create a change status: Depending on your requirements, proceed as follows:
- Insert the new change status after &V1&.
Use a change number with the appropriate valid-from date. If yougenerate the change number when you create the change status, enter thevalid-from date in the Key date> field.
- If you need a change status before &V1&, check the dates of the first
change status. You have the following options: The change status was created without a change number. In this case, you can no longer change the valid-from date. The change status was created with a change number. In this case, change the date of the change number to the desired date(Change Change Number>). You can then insert additional change statuses after this date.
|