SAP Message RMSA_VRS024 - Validity period in the version chain is adjusted

Diagnosis
In Customizing for versioning, you specified that the validity periodsof versions of an object must not overlap. You have now created aversion with a validity period that would overlap with the validityperiod of another version. To prevent this overlap from occurring, thesystem has adjusted the validity period of the created/existing versionin line with the following rules:

  • The valid-from date of a version is not changed.

  • The valid-to date of a version is only brought forward. It is not
  • extended.
    Example:
    Version 1 of an object is valid from 01/01/2002 to 01/31/2002. Youcreate version 2 of the object, which is valid from 01/15/2002 to04/30/2002. The system then automatically reduces the validity ofversion 1 to the period 01/01/2002 to 01/14/2002.