SAP Message RMSA_VRS015 - Validity period &1 - &2 is not allowed

Diagnosis
You want to create a version of an object, replace an object or changethe validity period of an object. This is not possible due to one ofthe following reasons:

  • It results in a gap or overlap in the validity period of the object
  • versions or in the validity period of the objects. However, inCustomizing for Versioning, you specified that gaps and overlaps arenot permitted.
    • When you change the validity period, the version sequence is changed.
    • This is generally not permitted.

      System Response
      INCLUDE RMS_GEN_PROCESSING_CANCELLED OBJECT DOKU ID TX

      Procedure

      • If you want to create a version of an object, enter a validity period
      • that follows on directly from the validity period of earlier versions.
        • If you want to replace an object, enter a predecessor object with a
        • validity period directly before the validity period of the successorobject (without gaps or overlaps), or change the validity period of thepredecessor object.
          • If you want to change the validity period of an object, the validity
          • period must start after that of the predecessor version and before thatof the successor version.