Diagnosis The individual requirement with reservation number &V1&, item &V2& wassplit in the pull list or was modified in the database in backgroundmode. 1st instance: splitting> WM staging can only be carried out for individual requirements thathave not yet been split into partial quantities. Splitting can havebeen carried out for one of the following reasons:
- You specifically accessed the function Splitting> for a
collective requirement, for example, to split a quantity to certainbatches.
- You have determined replenishment quantities from several replenishment
sources.When assigning replenishment quantities to requirement quantities, thesystem divides the individual requirements to be able to display theassignment of replenishment quantities to requirements quantities inthe details display.2nd instance: reservation modified in the background> The requirement quantity of the dependent requirement is modified onthe database at the same time as the procesing of the pull list. System Response In these instances, no WM staging of materials can be carried out forthe requirement. Procedure In the 1st instance:>
|