|
Diagnosis You are trying to change the reporting point structure for the runschedule header outwith the posting period. Changes to the reportingpoint structure are only possible within the current and the previousperiod. System Response The system cannot carry out the changes to the reporting pointstructure. Procedure Select a change date within the current or previous period. |