|
Diagnosis You want to carry out a reporting point backflush for a posting datethat lies in the future. Due to a costing in the future, a newreporting point structure already exists in historical file CHZP forthis posting date. This new reporting point structure is the result ofa routing change via history management. System Response The system can only manage one current reporting point structure. Whenbackflushing on the specified posting date, the system would thereforehave to activate the future reporting point structure. Then all futurebackflushes would be based on this future reporting point structure. Therefore, it is not possible to carry out a backflush using thisposting date. Procedure Check from which date the new reporting point structure exists in thefuture or until which date in future costing has been carried out. Carry out the posting for a date that lies before this data. |