SAP Message RM299 - Reporting point changed, but still decoupled confirmation to be posted

Diagnosis
For a production version, the reporting point structure should becreated again (with or without preliminary costing of the product costcollector), because reporting points have been added or deleted. On thesame day already, backflushes were created to which separate goodsissues or production activities must be posted.

System Response
The recording point structure cannot be updated, as the separate goodsissues or production activities would then not be made up for. If youare using preliminary costing, this is therefore terminated.

Procedure
First complete the postings that are still open (Logistics ->Production -> Repetitive Manufacturing -> Backflush -> SeparatedBackflush)