|
Diagnosis Integration between EWM and Manufacturing is active and the receivingstorage location is EWM-managed. You want to immediately post thebackflush for the components in the update task by using the setting inprocess control or in the detailed input for the confirmation. System Response This scenario cannot be supported for technical reasons. Procedure Change the setting in process control entered from the repetitivemanufacturing profile to specify that the backflush is to be performedimmediately (value = space) or later in a background job (value = 2). Procedure for System Administration |