SAP Message RI109 - No operating concern has been assigned to controlling area &

Diagnosis
The project/WBS element &V2& is assigned to controlling area &V1&.However, controlling area &V1& is not assigned to an operating concern.

System Response
The checks could not be made.

Procedure
Assign controlling area &V1& to an operating concern, or make thechecks omitting the settlement rule check.