SAP Message REMPT233 - Period "shift" only possible with production dates

Diagnosis
The period "shift" is only possible with production dates as basicdates are only accurate to the day.

System Response
The system cannot carry out the function.

Procedure
Switch from basic dates to production dates by choosing "View -->Reference dates" and call up the function again.