|
Diagnosis Validity period &V3& of expense item &V2& of the current expenses ispartly or completely outside of the validity period of cost efficiencyanalysis &V1&. System Response This situation was allowed in Classic RE, but leads to an error in themigrated dataset. Procedure In Classic RE, perform a comparison of the validity periods. Note thatthe validity period of the cost efficiency analysis must lie within thevalidity period of the higher-level cost efficiency analysis. Procedure for System Administration You can change this message in the Change Message Control>> IMG activity. If the message is issued as awarning message, then the legacy data check is not designated asincorrect and the migration process is therefore not interrupted. Theinconsistency then has to be corrected during the data conversion byadjusting the validity period to that of the assigned cost efficiencyanalysis. If the validity period of the expense item is completely outside thevalidity period of the cost efficiency analysis, then a correction isnot possible. In that case, the message control has no effect. |