SAP Message RECABC005 - &1: from-date (&2) is after to-date (&3)

Diagnosis
The start date &V2& of the period is after the end date&V3& of the period.

System Response
The from-date of a period always has to be before the to-date ofthe period.

Procedure
Correct the period so that the chronological order of the dates iscorrect.