|
Diagnosis For an> inspection point, a quantity must be assigned for eachpartial lot, in accordance with the settings at operation level. Aquantity was not assigned to any inspection point for this operationand partial lot.Procedure Assign a quantity to the current inspection point or to one of thefolling inspection points for partial lot &V1&. A quantity must beassigned to the partial lot before the usage decision can be made. |