|
Diagnosis The initial test for the stability study should be completed using afollow-up action for the usage decision. The corresponding statusshould then be set in the stability study automatically. However, since the stability study (notification) is blocked by anotheruser, the status cannot currently be set. Procedure Set the status "Initial Test Completed" manually using the relevantfollow-up function in the notification for the stability study. |