|
Diagnosis The control indicator 'SPC characteristic' is set for the masterinspection characteristic. If you inspect with a material specificationonly, this characteristic cannot be treated as an SPC characteristic ininspection processing. You also cannot run any control charts. If you want to use control charts, you must inspect with a task list. |