Diagnosis You want to use a master inspection characteristic that has beenchanged without history as an incomplete copy model. This is notpossible because the master inspection characteristic is being used:
As a reference in a task list
In a material specification
Procedure Choose one of the following options:
Define the master inspection characteristic either as a reference
characteristic or a complete copy model.
Cancel the references to the master inspection characteristic in the
task lists or material specifications. The uses can be displayed with the aid of the where-used list.
Change the master inspection characteristic with > history.