SAP Message QPMS013 - Insp. plan not suitable for multiple specifications - change assignments

Diagnosis
In the existing material-task list assignments for the existinginspection plan, an object type for multiple specifications has beenspecified although the indicator "MultipleSpecifications" has not been set in the inspection plan header.

Procedure

  • If the inspection plan should contain multiple specifications, you must
  • set the indicator "Multiple specifications" in the inspection planheader.
    • If the inspection plan should not support multiple specifications, you
    • must change the material-task list assignments in the following way:
      Delete the existing material-task list assignments that are defined formultiple specifications (this means, those assignments for which anobject type has been specified).
      If necessary, enter material-task list assignments that are required fordependent characteristic specifications.