SAP Message QPMS003 - Material-only assignment is missing for inspection plan

Diagnosis
The material-only assignment is missing for the existing inspectionplan. However at inspection lot creation, a material-only assignment isneeded to find the inspection plan. Material-only means that no otherobjects should be assigned to the inspection plan.
Example

  • In the inspection plan, you have made the following entries in the table
  • for the material-task list assignment:
    Material number/plant/pharmacopoeia
    Material number/plant/country
    Material number/plant/customer
    At inspection lot creation, the system cannot find an inspection plansince there is no material-only material-task list assignment
    • In the inspection plan, you have made the following entries in the table
    • for the material-task list assignment:
      Material number/plant
      Material number/plant/country
      Material number/plant/customer
      At inspection lot creation, the inspection plan is found since you havemade the material-only material-task list assignment.

      Procedure
      Create a material-task list assignment with a material number and plantfor the existing inspection plan.