|
Diagnosis You have selected a date as the valid-from date for plan creation thatis greater than the date that is used to select the control plan. System Response The plan cannot be created. Procedure Enter a valid-from date for the plan you want to create that is smallerthan or equal to the selection date for the control plan, or change theselection date in the basic data. |