|
Diagnosis No material assignment is entered for the specification or noQM-relevant usages with reference to a plant are defined and activated. System Response No material/plan assignment can be made when the plan is created.However, the material/plan assignment is a prerequisite for the as signment of characteristics to the inspection plan. Procedure Check the material assignment in the header of the specification. Check at property level that at least one QM-relevant usage with thevalidity area category "PLANT" is defined and activated. |