|
Diagnosis You have used a master inspection characteristic in which the SPCinspection> indicator is set to define an unplanned characteristic.An SPC inspection with control charts is not possible for unplannedcharacteristics.System Response The indicator for SPC inspections is not copied to the unplannedcharacteristic. Procedure No further actions are required. |