|
Diagnosis You can call up the operations for the inspection lot that require aninspection using the function Next operation>. You have reachedthe first operation to be processed that requires an inspection for theentered inspection lot.Procedure The following information applies to inspections without inspectionplans: An operation requires inspection if the indicator Inspectioncharacteristics required for the operation> is set in the control keyof the operation in the inspection plan. You have two options if you want to confirm the results for anoperation that has been marked as not requiring inspection:
- You can enter the operation on the initial screen of the transaction.
- You can access the operation within the transaction by selecting
Other operation>.
|