|
Diagnosis You have specified that an incoming inspection is to be performed.Goods receipt inspections are initiated at the same time with theresult that one item may have two inspection lots. Procedure You have two options:
- If you accept the process description, confirm the message.
- If you only wish to generate one> inspection lot, you should
either cancel the incoming inspection or goods receipt inspection orelse do not generate an inspection lot during goods receipt.
|