|
Diagnosis A task list could not be found for the selection criteria. Theinspection setup for this material in the quality management view ofthe material master defines an inspection with a task list. System Response Sample calculation and inspection lot release are not possible. Procedure Check the:
- Selection criteria
- Material/task list assignment
- Task list status
- Task list usage
|