|
Diagnosis You want to confirm activities for an inspection lot. However, nooperation could be found for which activities can be confirmed. This could be for one of the following reasons:
- No operations exist for the inspection lot (-> Plan).
- The operations for the inspection lot are not relevant for confirmation
(-> operation control key).
|