Diagnosis You are attempting to allocate activity type &V1& to the work center.However, this activity type has not be set up in controlling area &V2&for cost center &V3& on &V4&. Procedure
- Allocate an activity type to the work center that is set up for the cost
center &V3& on &V4& or
- setup the activity type you want in cost center &V3& within cost center
accounting to &V4&. Please remember, that both the assignment of a workcenter to a cost center and the allocation of an activity type to acost center have validity periods.
|