Diagnosis
If the cost estimate is a standard cost estimate, the system will issuean error message if the total of all cost components that are relevantto stock valuation is zero. A standard cost estimate with a costcomponent split of zero cannot be released for stock valuation becausethe sysem sets the status to "Costed with errors". System Response Procedure the usage of the BOM or material list the control keys of the operations the relevancy to costing indicator of the BOM items the procurement type of the material Sys_admin the valuation strategies for the materials in the valuation variant the definition of the cost components in the cost component structure the assignment of the cost elements to cost components the assignment of the cost component structure to a chart of accounts |