|
Diagnosis You want to process a change object (such as a BOM or document) withreference to the change number of an ECO. System Response The system checks the system status of the ECO. The ECO you selected has been given the system status "Locked" by auser. Procedure Check the ECO (and the object management records of the ECO, ifrequired).
- The status report logs the name of the user who locked the ECO
(Environment -> Reporting -> Status report).
- To unlock the ECO, set the system status "Unlock".
Change ECR>
|