|
Diagnosis You want to process a change object (such as a document) with referenceto an ECO. System Response The system checks the system status of the change objects in the ECO. The changes to the change objects in this ECO have already been made,and confirmed for the system status of the ECO. Procedure This message is a warning message. You can check the ECO and its changeobjects if required. Change ECO> |